Technology Centre Charges Faster
Pilkington are world leaders in glass and glazing.
D&G Power Solutions were engaged to design, plan and install an 11 x 44kW electric vehicle infrastructure. We led the project to fit reliable and robust ABB fast-charging products.
Survey The Site
With energy profiling we established the energy headroom.
Create Wiring Plan
Design and sizing before installing the distribution and cables.
Make Required Mods
To begin, some modifications were required to the substation.
Bury The Bases
Civils included trenches for the charger bases and making good.
Test And Certify
Every detail including glands and terminations is tested and certified.
For Pilkington, we’ve laid the foundations for a future of smarter, more reliable, and emission-free mobility. With ABB products we’ve deployed infrastructure that meet the needs of their next generation.