Pilkington are world leaders in glass and glazing.

D&G Power Solutions were engaged to design, plan and install an 11 x 44kW electric vehicle infrastructure. We led the project to fit reliable and robust ABB fast-charging products.

Survey The Site

With energy profiling we established the energy headroom.

Create Wiring Plan

Design and sizing before installing the distribution and cables.

Make Required Mods

To begin, some modifications were required to the substation.

Bury The Bases

Civils included trenches for the charger bases and making good.

Test And Certify

Every detail including glands and terminations is tested and certified.

For Pilkington, we’ve laid the foundations for a future of smarter, more reliable, and emission-free mobility. With ABB products we’ve deployed infrastructure that meet the needs of their next generation.

It pays to talk power

To find out more about this project, or to ask about your own Electric Vehicle Charging infrastructure, please get in touch.

Let’s talk power, plan budgets and solve problems, what ever you need, start your energy conversation with us.

Call us: 01744 759102 or email: [email protected]